Projects Completed 2019
Central Roadway Layby | Completed January 2019 | £6,000 |
Trumpington Street | Funded by Department | |
Relocation of motorcycle parking to outside old Structures Lab, and creation of layby opposite Stores in the central roadway to impove traffic flow and safety on site. | ||
Staff Kitchen Extension | Completed January 2019 | £35,450 |
Electrical Engineering | 13m2 | Funded by Department |
Extension and fit-out of existing staff tea-room into larger staff kitchen including the installation of kitchen cabinets and worktop counters within. Relocation of deli-bar and services to provide required space to accommodate the kitchen extension. | ||
Male WC Refurbishment | Completed April 2019 | £30,800 |
First floor, Baker Building | Funded by Department | |
Strip out and refurbishment of existing toilet to create a modern facility with increased occupancy use. Extension into library cupboard to maximise WC space. | ||
Laminar Flow Cabinet | Completed June 2019 | £38,500 |
Nanoscience | Funded by Department | |
Laminar flow cabinet extension: removal and manufacture/installation of larger area laminar flow cabinet with connections to house Nitrogen supply and bottle Argon. | ||
Chemical Storage | Completed July 2019 | £8,500 |
Nanoscience | Funded by Department | |
Installation of a secure chemical storage compound and relocation of bike racks to accommodate the installation. | ||
Cleanroom Modifications | Completed August 2019 | £16,000 |
Nanoscience | Funded by Department | |
Reconfiguration of existing bio-lab to create an additional smaller lab. | ||
Baker Common Room | Completed August 2019 | £574,000 |
Trumpington Street, Baker Building | 2,899m2 | Funded by University of Cambridge + Department |
The strip out and refurbishment of the existing common rooms to create an open, naturally lit and modern space for staff and students to congregate during mealtimes/breaks. Relocation and refurbishment of the existing boardroom. | ||
IFM Common Room Refurbishment | Completion September 2019 | £40,000 |
IFM | Funded by Department | |
Refurbishment of staff kitchen area, replacement of white goods, and kitchen worktops. | ||