Central Roadway Layby |
Completed January 2019 |
£6,000 |
Trumpington Street |
|
Funded by Department |
Relocation of motorcycle parking to outside old Structures Lab, and creation of layby opposite Stores in the central roadway to impove traffic flow and safety on site. |
Staff Kitchen Extension |
Completed January 2019 |
£35,450 |
Electrical Engineering |
13m2 |
Funded by Department |
Extension and fit-out of existing staff tea-room into larger staff kitchen including the installation of kitchen cabinets and worktop counters within. Relocation of deli-bar and services to provide required space to accommodate the kitchen extension. |
Male WC Refurbishment |
Completed April 2019 |
£30,800 |
First floor, Baker Building |
|
Funded by Department |
Strip out and refurbishment of existing toilet to create a modern facility with increased occupancy use. Extension into library cupboard to maximise WC space. |
Laminar Flow Cabinet |
Completed June 2019 |
£38,500 |
Nanoscience |
|
Funded by Department |
Laminar flow cabinet extension: removal and manufacture/installation of larger area laminar flow cabinet with connections to house Nitrogen supply and bottle Argon. |
Chemical Storage |
Completed July 2019 |
£8,500 |
Nanoscience |
|
Funded by Department |
Installation of a secure chemical storage compound and relocation of bike racks to accommodate the installation. |
Cleanroom Modifications |
Completed August 2019 |
£16,000 |
Nanoscience |
|
Funded by Department |
Reconfiguration of existing bio-lab to create an additional smaller lab. |
Baker Common Room |
Completed August 2019 |
£574,000 |
Trumpington Street, Baker Building |
2,899m2
|
Funded by University of Cambridge + Department |
The strip out and refurbishment of the existing common rooms to create an open, naturally lit and modern space for staff and students to congregate during mealtimes/breaks. Relocation and refurbishment of the existing boardroom. |
IFM Common Room Refurbishment |
Completion September 2019 |
£40,000 |
IFM |
|
Funded by Department |
Refurbishment of staff kitchen area, replacement of white goods, and kitchen worktops. |