Between April 2014 and June 2015, the Electrical Engineering Division Building Annexe was constructed. This was built as an extension to the existing Electrical Engineering Building, to provide a mix of office and laboratory space. Over the summer of 2015, the Cambridge Graphene Centre, and the Hetero-Genesys Laboratories took occupation of the new space.
The fit-out of a few areas, including the installation of clean rooms on the ground and second floors, were excluded from the original construction programme, and have been undertaken as separate Minor Works projects - see Minor Works section for more details.